An eight phased live refurbishment of 16 rehabilitation apartments. The works included replacement kitchens and bathrooms to suit a new revised fire compartment and DDA layout. Specialist health care fixtures and fittings, IPS units and fire doorsets were installed, as well as a complete upgraded nurse call system and a full mechanical and electrical redesign. The works were then complimented by new floor coverings and a full redecoration. The most challenging aspect of this project was working around the highly sensitive and secure live rehabilitation environment where we continually worked on segregating and screening our works and collaborating with the centre to ensure the most minimal amount of disruption was created during our works.